Feasibility check

System design

Installation & commissioning

Platform activation

We analyse the site's solar exposure, grid connection constraints, and the number and layout of lots to check the economics stack up. You get an honest read on whether it's worth pursuing before you spend anything.

Our engineering team designs the solar, battery, and (for full microgrids) the shared backbone and islanding circuits into your subdivision plans at consent stage - so it's part of the build, not an afterthought.

Panels and batteries are installed as the homes are built, coordinated with your builders. Every system is installed and certified by registered electricians, with Certificates of Compliance as required.

The monitoring and settlement platform goes live, enabling energy sharing across the neighbourhood and giving each home visibility of its generation and use. The infrastructure is built ready for peer-to-peer energy trading as that side of the platform develops.