
The problem
We treat energy as subdivision infrastructure, designed alongside the roads, water, and power, at the consent and build stage. Panels and batteries are installed as the homes go up, and the systems are connected so energy can be shared across the neighbourhood rather than wasted.
Dealing this at the design stage is far simpler than retrofitting dozens of individual homeowners later. The result is lower cost per home, better use of every kWh generated, and a development that stands apart in the market.
The Zolr approach
Grid connection is getting more expensive and less predictable. Lines company contributions, fixed daily charges, and rising retail rates now stack up over the life of a development and none of it is within the developer's control once the subdivision is handed over.
Solar usually gets bolted on afterwards, house by house, if at all. That's the most expensive and least effective way to do it.


Zolr offers two models depending on the site, the budget, and the level of resilience required


